Projects Completed

HILTON SAN DIEGO MISSION VALLEY | San Diego, CA
Parking Control.
CARLSBAD FIRST JOINT TRAINING FACILITY | Carlsbad, CA
Gate Automation.
MED IMPACT | San Diego, CA
Contracted through Reno Contracting and completed in 2010, APS installed a two gate system for the parking garage using Magnetics Barrier Gates, Entry Lane Ticket Stations, Exit Lane Ticket Stations, Cards Readers and Vehicle Loops Sensors.
ROSE RESIDENCE | Encinitas, CA
Contracted through Parker Construction and complete in November 2010. The Rose Residence doubled their driveway space off a narrow alley. APS installed a two custom wood tandem sliding gates and gate operating system taking a 30’ opening an sliding it into 15’ of space.
ATRIA | San Diego, CA
Contracted directly to the Homeowners Association and completed in January 2011. APS retrofitted the community security system by replacing all of their telephone entry systems and installing a video surveillance system to help prevent theft and vandalism of the properties.
THE LOFTS | San Diego, CA
Contracted through Oliver McMillan and completed in January of 2010. APS removed a problematic roll-up door and installed a custom galvanized overhead gate and surrounding panels with frosted Plexiglas to provide added security with an architectural appeal.
CAMPBELL RESIDENCE | Rancho Santa Fe, CA
Contracted directly with home owner and complete in June 2009. APS constructed and installed a custom architectural design wood gate, access control and gate operating system.
Atria Condominiums, San Diego ACCESS Control & VIDEO Surveillance
Projects Recently Awarded

























